Design-Bid-Build
Traditional method of project delivery focusing on lowest construction cost
- Project Delivery
- Design-Bid-Build
Design-Bid-Build (DBB) is the traditional method or hard bid method in which the agency or owner contracts with separate entities for the design and construction of a project. Typically, the lowest bid wins the project.
Owner Benefits of Design-Bid-Build
- Large pool of contractors
- Lowest price wins
- Eliminates subjective selection criteria
Owner selection is typically based on cost.
Featured Projects
College of Charleston TD Arena
Charleston, SC
Hard Bid
Thompson Turner Construction was hired by the College of Charleston to build the new 5,100-seat, TD Arena and renovate the existing John Kresse Arena. This state-of-the-art arena is the home of College of Charleston men’s and women’s basketball and volleyball teams.
College of Charleston Baseball Stadium
Charleston, SC
Hard Bid
Thompson Turner Construction was hired by the College of Charleston to renovate the Ballpark at Patriots Point stadium. The Ballpark at Patriots Point is the home of Cougar Baseball.
Park Street Parking Garage
Columbia, SC
Hard Bid
Thompson Turner Construction was hired by the City of Columbia to build the new multi-deck parking garage located in downtown Columbia.
Jones Nissan
Sumter, SC
Hard Bid
Thompson Turner Construction was hired by James Jones for the installation of new fascia system and renovation of office areas to the Jones Nissan dealership located in Sumter, SC