Caterpillar Hydraulics Plant
Sumter, SC
About the Project
∨ Type
Design-Build
∨ Market
Industrial
∨ Completion Date
December 2013
170,000 Square Foot Addition to an Existing Manufacturing Facility
The Caterpillar Hydraulic Plant was a Lump Sum design-build project. The project scope included the 170,000-square-foot addition to the existing manufacturing facility which details included:
- Conventional spread footing for support of structure steel columns, bar joists and metal deck frame
- Exterior precast wall panels supported on continuous perimeter footing
- 8” unreinforced concrete floor slab in plant area
- Office area with structural steel frame, metal stud, and EFIS exterior
- TPO roof system on plant and office
- Roof top HVAC units with gas heat
- Plant electrical service complete with Bus Duct
- Plant process piping to include compressed air, water, natural gas, weld gas, and DI water
- Exterior site improvements to include wetlands mitigation, grading, storm drain, access roads, parking, and landscaping